Sr.
No.
|
Module
|
Key Learning Outcomes
|
Equipment Required
|
1
|
Solar PV Essentials
Theory Duration
(hh:mm)
17:00
Practical Duration
(hh:mm)
17:00
Corresponding NOS
Code
ELE/N5901 KB1 to KB19
ELE/N9952 KB1 to KB2
ELE/N9953 KB1 to KB4
|
· Global overview of Power
Development.
· Global overview of Renewable
Energy Development including
Solar
· National overview of Power
Development
· National overview of Renewable
Energy Development including
Solar
· The Need of Solar Power, Benefits,
Application of Solar Energy
· Solar Power Myths
· Basics on solar energy and power
generation systems.
· Basic principles of Solar Power
(Solar Photovoltaic, Solar Thermal,
Dish Type, Solar Tower)
· Manufacturing process for Solar
Photovoltaic and Solar thermal
equipment
· Use and handling procedure of solar
panels, energy storage, control and
conversion
· Basic electrical system and
functioning of various electrical
devices
· AC and DC Supply essentials
· Components of Solar Systems
· mechanical equipment and its
functioning
· maintenance procedure of
equipment
· site survey, design and evaluation
of various parameters
· tools involved in installation of
system
· quality and process standards
· occupational health and safety
standards
· waste management and disposal
procedures and standards
· importance of wearing protective
clothing and other safety gear while
· carrying out installation
· precautions to be taken while
handling different electrical and
mechanical products
|
· Projector
· Different types of Solar Panels
· Components of a Solar PV
Installation Systems
· Solar Lighting and other
application systems
· Inverters
· Charge Controllers
· Testing Equipment
· Hand tools
|
2
|
Core and Generic skills
Theory Duration
(hh:mm)
17:00
Practical Duration
(hh:mm)
17:00
Corresponding NOS
Code
ELE/N5901 SA1 to SA3
ELE/N5902 SA1 to SA3
ELE/N9952 SA1 to SA5
|
· Read product and equipment
manuals, installation manuals, etc.
· Read warnings, instructions and
other text material on product labels,
components, etc.
· Fill in job completion form after
installation activities have been
completed
· To clearly communicate installation
and design instructions to team
· To clearly communicate customer’s
requirements
· To communicate the constraints and
quality requirements to team
|
· Product Manuals of PV Panels
· Charge Controllers
· Inverters
· Battery Bank
· On Grid and Off Grid System
components · Solar application appliances
|
3
|
Professional skills
Theory Duration
(hh:mm)
17:00
Practical Duration
(hh:mm)
17:00
Corresponding NOS
Code
ELE/N5901 SB1 to SB5
ELE/N5902 SB1 to SB8
ELE/N9952 SB1 to SB4
ELE/N9953 SB1 to SB2
|
· Purpose and specification of tools
used in maintenance activity
· How to operate/use different tools
such as screw driver, inspection
fixtures, wire cutter, pliers, tester,
spanner, etc.
· How to handle tools and equipment
and maintain them in a good
condition
· How to interact with supervisor to
understand the daily production
target
· How to interact with co-workers in
order to coordinate work processes
· Reflective thinking
· Decision making
· Critical Thinking
|
· Hand tools
· Testing tools
|
4
|
Understanding the
work requirement
Theory Duration
(hh:mm)
17:00
Practical Duration
(hh:mm)
17:00
Corresponding NOS
Code
ELE/N5901 PC1 to PC6
|
· Understand the individual work
requirement and areas of operation
· Interact with the supervisor in order
to understand the installation targets
for the day and/or week
· Understand the location of
installations and optimise the route
plan
· Plan the day’s activities and the
complete work plan for each
installation
· Coordinate with the various
departments and persons involved
in installation
· Operation such as design, logistics,
material handling and stores
· Minimise absenteeism and report to
work on time
|
· Videos
· PPT’s
· Laptop
· Projector,
· Projector Screen
· White Board
· Marker
· Duster
· Attendance Sheet
· Feedback Form
· Internet
|
5
|
Assessing site
conditions and
understanding
installation
requirements
Theory Duration
(hh:mm)
17:00
Practical Duration
(hh:mm)
17:00
Corresponding NOS
Code
ELE/N5901 PC7 to PC18
|
· Assess the site level pre-requisites
for solar panel installation
· Decide on the type of mounting to
be made such as roof top, open
fields, small spaces
· Ensure that land is levelled for flat
surface mounting
· Decide the type of mounting
accessories required for installation
as per the site condition
· Decide the place of installation and
ensure maximum period of sunlight
is captured in the area
· Ensure that construction is strong to
hold solar panel for 20-25 years,
especially, on roof top
· Inform the customer for any civil
construction to be undertaken for
installing the panels To be
competent, the user/ individual must
be able to: understand the location
and mounting preference of
customers, interact with customers
and understand the purpose of
installation and suggest alternatives
· Match the voltage and power output
of the type of installation designed
and losses with customer’s
requirement
· Inform customers about the
approximate time required for
installation and any requirements
during installation
· Get concurrence from the customer
on the package of materials to be
procured for installation based on
agreed design
|
· Videos
· PPT’s
· Laptop
· Projector,
· Projector Screen
· White Board
· Marker
· Duster
· Attendance Sheet
· Feedback Form
· Internet
|
6
|
Collecting the materials
for installation and
ensuring quality of
material and handling
Theory Duration
(hh:mm)
17:00
Practical Duration
(hh:mm)
17:00
Corresponding NOS
Code
ELE/N5901 PC19 to
PC30
|
· Arrange for and collect the solar
panels as per customer’s
requirement
· Ensure that the quantity of modules
/ panels match the voltage
requirement of the system
· Arrange for mounting stands as per
design
· Arrange for tools and consumables
required for mounting the solar
panels
· Decide on the workforce required
and arrange for team
· Ensure that only company
recommended quality materials are
used unless specified by customer
· Ensure all the materials procured
are QC passed
· Ensure that module is not damaged
and the outer glass is not broken
· Understand the material handling
requirement and follow the standard
operating procedure while moving
them
· Cover the glass module with an
opaque material to ensure that there
is no electricity generation before
installation
· Ensure standard module handling
procedure such as two people
should lift a module; module should
not be carried on head, etc.
· Ensure that modules are stored in a
way that it is not damaged by falling
or by any external disturbance
|
· Charge Controllers
· Invertors
· On Grid and Off Grid system
components
· Application Equipment
· Testing Equipment
|
7
|
Organizational context
Theory Duration
(hh:mm)
17:00
Practical Duration
(hh:mm)
17:00
Corresponding NOS
Code
ELE/N5901 KA1 to KA9
ELE/N5902 KA1 to KA9
ELE/N9952 KA1 to KA3
ELE/N9953 KA1 to KA4
|
· Company’s policies on: incentives,
personnel management
· Company’s code of conduct
· importance of individual’s role in the
work flow
· Organisation culture
· Company’s reporting structure
· Company’s documentation policy
· Company’s different department
and concerned authority
· Company’s installation policy
· Company’s customer support policy
|
· Charge Controllers
· Invertors
· On Grid and Off Grid system
components
· Application Equipment
· Testing Equipment
|
8
|
Understanding
installation and
material usage
procedure and
assessing mounting
Theory Duration
(hh:mm)
17:00
Practical Duration
(hh:mm)
17:00
Corresponding NOS
Code
ELE/N5902 PC1 to PC14
|
· Understand the customer
requirement on installation
· Ensure that all appropriate materials
are available during installation time
· Ensure that the installation meets
the local building rules and
regulations
· Ensure to disconnect PV module
from any electric sources such as
batteries, inverters, etc., before
working on the module
· Check that the module is defect free
before installing
· Ensure to take specified measures
such as fire resistance, corrosion
resistance for the module during
installation
· To be competent, the user/
individual must be able to:
· Understand the type of mounting
and other accessories required
· Assess the degree of inclination and
angle of tilt of PV module for the
specific area, locality or region to
enable the system absorb maximum
annual sunlight
· Ensure that sunlight falls
perpendicular to the PV module to
absorb maximum energy
· Ensure that panels are mounted in a
place where there is no shade at
any time of the year
· Ensure that mounting is strong to
withstand wind, rain, etc.
· Ensure that any special construction
requirement for mounting is done by
following acceptable quality
standards, especially, in rooftop
installations
· Use approved tools for mounting
· Set the mounting fixture firmly at the
desired location
|
· Charge Controllers
· Invertors
· On Grid and Off Grid system
components
· Application Equipment
· Testing Equipment
· Clamping Accessories for
installation
|
9
|
Installing the panel and
connecting the system
and check for
functioning
Theory Duration
(hh:mm)
16:00
Practical Duration
(hh:mm)
16:00
Corresponding NOS
Code
ELE/N5902 PC15 to
PC32
|
· Remove packaging of the solar
panel carefully
· Handle the panels carefully without
damaging the material
· Take safety measures and wear
protection gear such as gloves to
avoid shock / injuries while handling
modules
· Cover the module with opaque
material while installing to avoid any
current generation
· Ensure that junction box in covered
· Do not disturb or disassemble any
part of the module part during
installation
· Take necessary precautions for fire
resistance of modules
· Use recommended material of solar
cable and plugs for electrical
connection
· Install spare fuse to avoid any short
circuits as per company policy
· Mount the module on the fixture with
the mounting rails using bolts and
nuts
· Ensure that the panels are mounted
firmly To be competent, the user/
individual must be able to:
· Use the cables to connect multiple
PV modules in combination to
generate the desired voltage and
current
· Choose type of connection, i.e.,
series or parallel, as per design
· Use recommended cable to
generate maximum voltage
· Check the maximum system voltage
as per the installation and follow
adjustment measures accordingly to
match output requirement
· Ensure that the modules are
grounded as specified
· Connect the system and check for
functioning
· Escalate for any issues faced during
the functioning of the system
|
· Charge Controllers
· Invertors
· On Grid and Off Grid system
components
· Application Equipment
· Testing Equipment
· Clamping Accessories for
installation
|
10
|
Completing the work
and following quality
and safety procedures
Theory Duration
(hh:mm)
16:00
Practical Duration
(hh:mm)
16:00
Corresponding NOS
Code
ELE/N5902 PC32 to
PC43
|
· To be competent, the user/
individual must be able to:
· Clean the work area after
completing the installation activity
· Remove all the tools, consumables
used from the installation area
· Fill in the job completion form and
get the signature of the customer
· Inform customers about
maintenance of solar panels and
procedure for cleaning of solar
panels
· Follow company standards in
documentation of installation
activities performed To be
competent, the user/ individual must
be able to:
· Remove any metals or jewellery to
avoid possibility of current shock
during installation activity
· Wear all safety gears such as work
shoes, cotton gloves, goggles while
carrying out installation activities
· Take specified precautionary
measures while handling electrical
system
· Keep work area clean and
organised
· Adhere to relevant health and safety
standards
· Dispose of any waste materials in
accordance with safe working
practices and procedures
|
· Charge Controllers
· Invertors
· On Grid and Off Grid system
components
· Application Equipment
· Testing Equipment
· Clamping Accessories for
installation
|
11
|
Interacting with
supervisor and
coordinating with
colleagues
Theory Duration
(hh:mm)
16:00
Practical Duration
(hh:mm)
16:00
Corresponding NOS
Code
ELE/N9952 PC1 to PC17
|
· Understand and assess work
requirements
· Understand the targets and
incentives
· Understand new operating
procedures and constraints
· Report problems in the field
· Resolve personnel issues
· Receive feedback on work
standards and customer satisfaction
· Communicate any potential hazards
at a particular location
· Meet given targets
· Deliver work of expected quality
despite constraints
· Get trained on latest technologies
and updates
· Receive positive feedback on
behaviour and attitude shown during
interaction
· To be competent, the user/
individual must be able to:
· Interact with colleagues from
different functions and understand
the nature of their work
· Receive materials from tool room or
stores; deposit faulty modules and
tools to stores
· Pass on work allocation to
colleagues in a respective
geographical area
· Share work according to
competency and capability
· Assist colleagues with resolving
field problems resolve conflicts and
achieve smooth workflow
· Follow the company policy during
cross functional interaction
|
|
12
|
Following safety
procedures and
participating and drills
and workshops
Theory Duration
(hh:mm)
16:00
Practical Duration
(hh:mm)
16:00
Corresponding NOS
Code
ELE/N9953 PC1 to PC15
|
· comply with safety procedures
followed in the company
· take adequate safety measures
while handling hazardous materials
or tools
· take necessary measures while
handling electrical equipment
· escalate matters about hazardous
materials or things found in the
premises
· follow appropriate material handling
procedures to avoid any damages
and injuries
· Use safety materials such as
gloves, goggles, masks, helmets,
etc.
· undertake adequate safety
measures while on work to prevent
accidents
· ensure zero accidents in work
· avoid damage of components due to
negligence in ESD procedures
· ensure no loss for company due to
safety negligence To be competent,
the user/ individual must be able to:
· participate in regular safety drills for
being prepared in the event of a fire
or natural calamity
|
· Safety equipment
|
|
Total Duration
Theory Duration
200:00
Practical Duration
200:00
|
Unique Equipment Required:
· Allen Key Set
· Batteries
· Cable Ties
· Charge Controller
· Connecting Wires
· Digital Multimeter
· Drill Machine
· Lead Solder
· Load (AC/DC)
· MC4 Connectors
· Mechanical Fixtures Required For Panel Installation
· PCUs
· Plier
· Regulated Power Supply
· Safety Gloves
· Safety Helmet
· Safety Shoes
· Screw Driver Set
· Solar Chart
· Solar Conversion Kits
· Solar Inverter
· Solar Panels
· Soldering Flux
· Soldering Iron
· Wire Stripper
|